Construction & completion of Enabling Works Package For The Proposed Serenia District West. These Works Include Excavation & Fill, Shoring, Piling Works, Pile-Head Treatment And Dewatering.


SCOPE OF WORK


Shoring work

  • 750 mm Dia Piles -161 M

 Piling Works

  • 1000mm dia piles – 231 Nos. – Avg. Length 22.5m

  • 1200mm dia piles – 142 Nos. – Avg. Length 34.075m

Site Clearance 


10,409 Sq.m.


Excavation works 


49887 cu.m.