SERENIA DISTRICT
Construction & completion of Enabling Works Package For The Proposed Serenia District West. These Works Include Excavation & Fill, Shoring, Piling Works, Pile-Head Treatment And Dewatering.
SCOPE OF WORK
Shoring work
750 mm Dia Piles -161 M
Piling Works
1000mm dia piles – 231 Nos. – Avg. Length 22.5m
1200mm dia piles – 142 Nos. – Avg. Length 34.075m
Site Clearance
10,409 Sq.m.
Excavation works
49887 cu.m.
Client :
Serenia Residence Limited
Consultant :
Godwin Austen Johnson
Location :
Dubai - United Arab Emirates