This works involves Piling & Enabling work for Arada's W Residences.
SCOPE OF WORK
Up to bulk excavation levels (-2.10m DMD and -10.425 DMD including slope) 85.929 M3
External Shoring wall system, Secant Pile Wall with Temporary Strut Supporting system including guniting 554 M
Design, supply and installation of a dewatering system
Design and Construction of adequate piling system
Piling works 1000mm diameter piles 99 Nos and 1500mm diameter piles 190 Nos including associated Pile Testing Works
Client :
Arada Developments LLC
Consultant :
Dar Al Handasah Consultants Shair and Partners
Location :
Dubai - United Arab Emirates