PROPOSED G+2P+30+2R STOREY RESIDENTIAL & COMMERCIAL BUILDING

The scope covered under the Enabling Works Package comprises site clearance, establishment of temporary facilities and utilities, and backfilling works, piling design and installation, soldier pile shoring design and installation, dewatering, and pile testing works.


SCOPE OF WORK


Backfilling with imported materials 20,700 M3:


• Contiguous Soldier Pile Shoring System 294 M

• Design and construction of bored concrete piles 900 mm dia. Piles 90 Nos , 1200 mm dia. Piles 193 Nos.

Client             :

Assetflex Properties LLC

Consultant    :

Lacasa Architechts & Engineering Consultants

Location        :

Dubai - United Arab Emirates